Rockin' HK Barn
  • Home
  • Contact Us

Construction Site Clearing Started Today

8/28/2013

 
Picture
So far only some ferns have been removed by lucky Craigslist readers, so we have a little more to get out of the way!
Picture
View from where the front door will be
Picture
Pat, our master tree faller, starts to work on that double tree you can see in the middle of the photo above...
Picture
Pat has the first half of the double tree down and Steve has started on the old stumps in the middle
Picture
A cable tensioned by the bulldozer helps put the trees EXACTLY where he wants them to fall
Picture
Look at that! Yes, he expected it to fall that close to the dozer, which he was sitting in (pulling) when the tree came down. It scared us, watching from above
Picture
Five trees missing from the area now (the stump of the double tree visible through the cab of the excavator), and Steve has been busy with the mini excavator looking for the existing sewer lines and septic tank
Picture
The big ones of this stand would be too close to the new addition
Picture
View from the East Northeast on day one of clearing
Picture
Found the septic tank, line fromt he house and the crazy 90 degree turns where they plumbed in the current house to the old system. gotta get rid of those!

Comments are closed.

    Click on the title of the Post to see the Whole Day

    OR,  click on the READ MORE link below the introduction for that day.
    If you want to read in chronological order and I've added a number of days at a time (sorry!), you'll need to scroll down to begin at an earlier date and work your way up.

    Archives

    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.