Sub-Floor Goes Down

9/26/2013

 
Picture
Picture
Picture
Picture
Picture
More than half done with the sub-floor. Leaving some hatches for the electrician to get down there more easily, as the design of the roof and ceiling will prevent him from running wires in an attic (the more normal way).
The entire sub-floor went down today, and then got covered with the mega-tarps in preparation for the weather forecast for the weekend: the deluge of 2013.

Comments are closed.

    Click on the title of the Post to see the Whole Day

    OR,  click on the READ MORE link below the introduction for that day.
    If you want to read in chronological order and I've added a number of days at a time (sorry!), you'll need to scroll down to begin at an earlier date and work your way up.

    Archives

    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.