The Concrete Pour! (Well, actually Pump)

9/13/2013

 
Picture
The pumper is here, hose in place. Now just waiting on the concrete truck
Picture
Here he is!
Picture
They started with the footing in the Southeast corner. It's all hands on deck when that concrete starts to flow
Picture
Got all the footings done, then came back around to do the stem-walls
Picture
Have to get the top of the stem-wall smooth
Picture
The well-reinforced Tulikivi footing got filled last
Picture
Smooth wall tops and the electrical ground with the tag from the inspector
Picture
It took two truckloads, with only half a yard left over

Comments are closed.

    Click on the title of the Post to see the Whole Day

    OR,  click on the READ MORE link below the introduction for that day.
    If you want to read in chronological order and I've added a number of days at a time (sorry!), you'll need to scroll down to begin at an earlier date and work your way up.

    Archives

    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.